Applications · IPC

Industrial PC Platforms

From fanless PCs to rack systems, industrial computers differ in board design, available space and operating conditions. Memory and storage selection also needs to account for the platform’s expected service life.

01

Platform Requirements

Industrial PC requirements center on extended operation inside the installed enclosure and a production and service life that may span multiple years.

Continuous Operation

  • Platforms may operate for extended periods without scheduled shutdown
  • Enclosure and cabinet conditions may differ materially from laboratory test environments
  • Validation is performed under conditions representative of the installed enclosure

Platform Lifecycle

  • Industrial PC platforms may remain in production or service for multiple years
  • Component changes may require compatibility review or requalification
  • Where included in the approved program scope, configuration and BOM changes follow defined change-review requirements
02

Applicable Memory & Storage

Select modules against the target board and BIOS configuration, then review thermal conditions in the installed enclosure.

Memory

  • DDR3 / DDR4 / DDR5 U‑DIMM
  • DDR3 / DDR4 / DDR5 SO‑DIMM
  • Modules are qualified at JEDEC operating settings unless the program defines otherwise.

Storage

  • 2.5″ SATA III
  • M.2 PCIe 3.0 (2280)
03

Qualification Process

Stability is validated under continuous duty, in conditions representative of the installed enclosure rather than the test lab.

01

Requirements Definition

Platform configuration, interfaces, operating conditions and lifecycle are identified.

02

Configuration Selection

Form factors are selected against the target board and program requirements.

03

Sample Verification

Initial samples are evaluated before configuration approval.

04

Platform Validation

Compatibility and stability are verified on the target platform.

05

Qualification

The configuration is approved against program requirements.

06

Production Control

Production runs under established quality-control procedures, with change review where included in the program scope.

04

IPC Qualification Priorities

IPC priorities typically run from board-level compatibility to lifecycle planning.

Continuous-Duty Stability
Validation under the expected operating duty cycle.
Platform Compatibility
Verification against the target board, BIOS and system configuration where applicable.
Operating Environment
Evaluation against the relevant thermal and enclosure conditions.
Configuration Control
Management of qualified configurations through defined change-control procedures.
Lifecycle Planning
Planning for component availability, generation transitions and requalification requirements.

Platform Configuration Review

Provide the target board specification, memory architecture, storage interface, operating conditions and expected program lifecycle. SIMORCHIP engineering will review the applicable memory and storage configuration and define the recommended qualification scope.